Solutions · 3 steps
Machine Bases and Anchoring
Filling 10–75 mm gaps under industrial machine bases, steel column anchors and precast joints with non-shrink grout.
Layers and products
The order is the application order. Hover over a step in the list to highlight its layer in the cross-section.
Layer
- 1
Step 1 · Formwork and surface preparation
Formwork must be watertight and pressure-resistant; absorbent surfaces are saturated with no standing water.
- 2
Step 2 · Grout pour (10–75 mm)
GROUTDERNon-Shrink Grout Mortar
Poured continuously from one side to avoid air entrapment; 20 N/mm² at 1 hour, 65 N/mm² at 28 days.
View product
- 3
Step 3 · Thicknesses above 75 mm
Clean 5–12 mm aggregate may be added at 30% of the grout weight.
Products used in this solution
Other application solutions
Request a quote
Let us select the right product for your project.
Tell us about the application area, substrate and specification; our technical team will get back to you on product selection, consumption and application details.